NEW DELHI / BENGALURU / AHMEDABAD — India’s overnight intercity rail network is set for its biggest generational leap since the introduction of the Rajdhani Express in 1969 as Indian Railways completes 180 kmph oscillation and emergency-braking certification for the indigenous 16-coach Vande Bharat Sleeper trainset, paving the way for commercial flag-offs across high-density 1,000-to-1,500-kilometre trunk corridors.
Co-engineered by BEML in Bengaluru and the Integral Coach Factory (ICF) in Chennai using austenitic stainless steel and distributed underslung propulsion, the new sleeper fleet complements the recently announced Amrit Bharat Express 3.0 intercity expansion while bridging the gap to India’s 320 kmph Mumbai–Ahmedabad Bullet Train corridor.
Vande Bharat Sleeper vs Rajdhani Express: Technical & Commercial Comparison
| Performance / Passenger Feature | Vande Bharat Sleeper (Version 1.0) | LHB Rajdhani Express (WAP-7 Hauled) |
|---|---|---|
| Design / Operating Speed | 180 kmph Test / 160 kmph Commercial | 160 kmph Design / 130 kmph Commercial |
| Traction Architecture | Distributed EMU Power (50% motorized axles) | Single Push-Pull / Head-End Electric Locomotive |
| Total Berth Configuration | 823 Berths (611 in 3A, 188 in 2A, 24 in 1A) | ~750–900 Berths (Variable 18–22 LHB coaches) |
| Safety & Fire Standard | Native Kavach 4.0 + EN-45545 HL3 Fire Barrier | Retrofitted Kavach + standard LHB disc brakes |
| Cabin Comfort Upgrades | Jerk-free couplers, sensor doors, 1A hot shower & USB-C | CBC couplers, manual vestibule doors & standard berths |
Inside the 823-Berth Cabin Design and Kavach 4.0 Safety Envelope
Addressing long-standing passenger feedback from overnight travellers, BEML and ICF redesigned the upper-berth access ladder with wider contoured steps, added individual goose-neck reading lights and 65W USB-C laptop charging sockets at every berth, and installed automatic acoustic sliding doors between sleeper bays and the gangway vestibule to block wheel-rail noise.
On the Mumbai–Ahmedabad High-Speed Rail (MAHSR) corridor, meanwhile, the National High Speed Rail Corporation Limited (NHSRCL) confirmed that 345 kilometres of elevated viaduct and all river bridges across Gujarat have reached structural completion, with track-slab laying for the E5 Series Shinkansen trainsets advancing toward the 2027 Surat–Bilimora trial window. Follow national infrastructure updates on our India National Desk.
Reader Comments 0